You may also be interested in
Software, Clamping system, Coordinate measuring machine, Electrode holder, Collet chuck
Text version of the page
1
EROWA MTS
A max. 1000 mm
B max. 1500 mm
150
100
50
0
30 35 40 45 50
A mm
C mm
300
200
100
50
30 35 40 45 50
B mm
C mm
A ř130 mm B ř130 mm
C
X
X
Standardization
EROWA MTS palletizing system
A Maximum distance between the
MTS centering spigot and the MTS
compensation spigot.
B Maximum distance between the
MTS centering spigot and the
MTS chucking spigot.
The higher the machining forces
or the more precise the tolerances,
the shorter the maximum pallet
projection.
The set–up distance X is the distance
between the centers of MTS chucks on
base plates.
The set–up distance of MTS chucks on
MTS base plates is standardized at
200 mm or 250 mm.
When MTS integrated chucks are
fitted, the set–up distance X should
amount to at least 140 mm.
When MTS mounted chucks are fitted,
the set–up distance X should amount
to at least 200 mm.
Any technical data listed in this EROWA catalogue are not binding. We reserve the right to make any technical modifications.
Application tips
Di s t a n c e b e twe e n c h u c k i n g s p i g o t s
P a l l e t p r o j e c t i o n
S e t – u p d i s t a n c e
Steel/cast iron
Aluminum
Steel/cast iron
Maximum projection A Maximum projection B
Aluminum
51
|
|