Catalogue CONTEC Products Catalog Ver.11 New Products Highlight
www.contec.com
print switch display
Page / 14
CONTEC - 2111
/ 14
See other catalogues for CONTEC
Text version of the page
jUINItU sULUIIUIN
QUALITY POLICY
CONTEC takes great pride in meeting and maintaining the best standards of quality in products and services.
CONTEC products are highly dependable and are manufactured with a guarantee of complete customer satisfaction.
ICS)!
UKAS
ENVIRONMENTAL MANAGEMENT
001
w
V
UKAS
ENVIRONMENTAL MANAGEMENT
001
ISO 9001
CONTEC obtained ISO 9001 accreditation in 1995 and gained re-accreditation in 2004.
ISO 14001
CONTEC obtained ISO 14001 certification in 2002.
ISO 9001: 2000, JIS Q 9001: 2000 Approval Certificate No: YKA0937904 Certificate Approval Place: CONTEC and CONTEC EMS
ISO 14001: 2004, JIS Q 14001: 2004 Approval Certificate No: YKA0773041 Certificate Approval Place: CONTEC
and CONTEC EMS
Quality assurance system (DR system) based on ISO 9001
Warranty
Using all resources and capabilities of our company, we are conducting quality assurance activities according to five processes specified in ISO 9001 shown below.
"Quality of Planning" assurance (DR0)
All of CONTEC's products are built to exacting specifications under stringent quality-assurance guidelines. All products are covered by warranty.
Maintenance Service will continue for six years* after production repair is discontinued or upgrade will be offered.
• Management
Market research, Needs, Specifications Prognostic approach to prevent qualityrelated problems
Market information (research)
• Marketing
Planning Specification
• Sales
• Engineering
• Quality assurance
Initial failure
3 Months
Repair free of charge
• Production
"Quality of design" assurance (DR1)
Research and development Design ^ Sales
• Engineering
• Quality assurance Prototype Verification and evaluation • Production
"Quality of pre-production" assurance (DR2)
• Engineering ..................... ©Quality assurance
• Production
Preparation for production
"Quality of conformance" assurance (DR3)
Assessment of 1st lot from trial production
• Quality assurance
• Production
Assessment of mass production
1 ~ 3 years
Repairs on a user-pay basis will be avalable once the free-of-Repair on a charge repair period expires (If repairs are needed due to user charged basis mishandling, the product must be serviced on a charged basis even if it still within the free-of-charge repair period)
Design validation, Design verification
When the repair service is available
3 weeks (Repair / To be replaced with new ones.)
4M
► Machine (Man
> Material
Method
7 years (System specifications will include life cycles of those components with a preset design life)
For those products with the long-term supply guarantee, manufactoring will continue for approx. 5 years (If upward compatible product cannot be supplied due to the unavailabilityofparts,productionmayneedtobe discontinued.)
Design life
14
Long-term supply guarantee
Avoidance of recurrence, Traceability, Process control
* Sometimes 2 years
ests and Evaluations
Transfer of production control Production Commissioning 1
The following functions, environments and specifications are verified during development and production to ensure the quality of "design", "pre-production works" and "production".
"Quality of service" assurance (DR 4)
Verification of environmental specifications Temperature and humidity Voltage drop
Source voltage Vibration
Noise resistance Impact
Verification of functions Each individual part
Full system
Operating systems & drivers
Electric current consumption
Product warranty terms
Aging
Service Sales
Qualityassurance
Maintenance,
Field Service
Static electricity
Insulation
Instantaneous blackout Insulation resistance
IP65/CEmark/UL
Specific;
Specifications specified models / options
DirectIndustry's Virtual Technical Library: PDF Catalogue | Technical Documentation | Brochure | Manual | Industrial directory | Specifications | Characteristics
Search Go
page 1 p.1
page 2 p.2
page 3 p.3
page 4 p.4
page 5 p.5
page 6 p.6
page 7 p.7
page 8 p.8
page 9 p.9
page 10 p.10
page 11 p.11
page 12 p.12
page 13 p.13
page 14 p.14