Cameron's Clif Mock True Cut "C" Series Samplers - Cameron - #1

/ 4


catalogue search
Cameron's Clif Mock True Cut
P. 01
Cameron's Clif Mock True Cut
P. 02
Cameron's Clif Mock True Cut
P. 03
Cameron's Clif Mock True Cut
P. 04
Pages:
Cameron's Clif Mock True Cut "C" Series Samplers - Cameron


See other catalogues for Cameron

Text version of the page

MEASUREMENT SYSTEMS

CLIF MOCK™

Cameron's Clif Mock True Cut "C" Series Samplers - 25235 True Cut ™ “C” Series Samplers

For more than three decades, the electrically powered C Series inline sampler has been one of the most accurate and reliable methods of extracting a product sample from a pipeline for basic sediment and water (BS&W) analysis.

C-Series Probe

The C-Series isokinetic inline samplingprobe (shown assembled with a controller) requires neither air nor hydraulics to capture samples. Rather, the probe is actuated by an electrical pulse from a controller, and uses existing pipelinepressure to fill the sample chamber withproduct. When the probe is actuated, a sample chamber opens, allowing process fluid to flow through the chamber. As the window rotates, the sample is captured in its natural state and fed by pipeline pressure to a receptacle. By ensuring that the process fluid is well-mixed and homogenous prior to sampling, and using a sampling process that collects thesample directly from the flow streamwithout changing the linear velocity or direction of flow, the customer is assured of obtaining a representative sample. The C Series sample probe is available in two models: •The C21 probe collects one sample (1.5 cc) per each 360°rotation.•The C22 probe collects two samples (3 cc) per each 360°rotation. Each model is available in two operatingpressure ranges (see Specifications table below). A “V” is used to identify low- operating-pressure probes. All C Series probes are suitable for sampling in 2-in. to 48-in. pipelines.
Tanker loading/unloading systems Truck terminals Pipeline measurement Refineries/pipelines LACT units Loss control Custody transfer points Petrochemical plants Process vessels Barge facilities H2S service

pageCatalog pdf di En 2012-05-20-18