CASE STUDY Project Summary Organization: Armando Rito Engenharia SA Solution: Bridges Location: Catumbela, Benguela, Angola Project Objective: • Design a cable-stayed bridge to replace the antiquated one-way bridge over Catumbela River. • Create an aesthetic form that symbolizes the end of war and the freedom of the Angolan people. • Provide a low profile, slim deck, with piers outside the main river channel to minimize impacts on the urban setting. Products used: RM Bridge MicroStation Fast Facts • RM Bridge was used to create a 3D structural model of the cable‑stayed bridge, including pylon geometry and cable stays. • The team used RM Bridge to perform construction stage analysis, considering time dependent functions. • The RM Bridge Addcon module was used to determine optimized cable‑stay tensioning forces during construction stages. ROI • The innovative saddle design developed for the stays, allowed a reduction in steel quantities and slimmer concrete masts. • A more conventional solution for the Pylon Anchorages would have resulted in an increase in concrete and reinforcement quantities of 10-15% plus an estimated 25 metric tons of structural steel for the anchorage caissons. RM Bridge Enables Armando Rito Engenharia to Improve Quality of Life in Angola Bridge Reduces River Crossing Time from 2 Hours to Less than One Minute Rebuilding Post-war Infrastructure In the aftermath of a devastating civil war, the Republic of Angola faced the daunting task of rebuilding its infrastructure. As part of this effort, Armando Rito Engenharia SA Lisbon, Portugal, was retained by the Road Institute of Angola on behalf of the Ministry of Public Works to design the 4th of April Bridge over the Catumbela River. The EUR 26 million cable-stayed bridge replaced an antiquated one-way bridge, which turned a two-hour-or-more journey between the cities of Benguela and Lobito into a 30-minute drive. The project team used RM Bridge Bentley’s comprehensive software for bridge design and analysis, to develop the impressive cable-stayed solution, which not only improved the quality of life in this community, but also marked a remarkable engineering achievement that benefitted from a comprehensive 3D model for analysis. RM Bridge helped the team achieve technical innovations in pylon geometry, cable­‑stay design, and optimization of cable-stay tensioning through all construction stages, enabling the team to design a structure that has a modern aesthetic, as well as an impressive engineering design. Opened in 2009, the bridge symbolizes the end of war and the freedom of the Angolan people. One-way Bridge Replaced with Innovative Cable-stayed Bridge A former Portuguese colony, Angola is an African nation that was for decades torn by war. The civil conflict took a toll on both the people and the built environment. During those years, the road system along with a vast number of bridges ended up being destroyed or heavily damaged. Since the end of the armed conflict, the country has been rebuilding, and Armando Rito has worked in Angola since 2000 constructing about 30 bridges as part of that rebuilding. The 4th of April Bridge is part of the highway between Benguela and Lobito, crossing the Catumbela River approximately 7 kilometers north of the Atlantic coast. Previously, the crossing was made using a single-lane bridge built in the early 20th century. Crossing the river seldom took nearly two hours. To address that problem, Armando Rito proposed a new bridge that would be an aesthetically pleasing landmark, and yet demonstrate the technological advancement that symbolizes Angola’s will to rebuild itself in the modern era. The bridge geometry and technical solutions, from deck to pylons, reflect not only modern structural concepts but also the country’s forward-looking vision for form and function in infrastructure. Several constraints influenced the design of the replacement bridge. Its location in the heart of the city of Catumbela required the road profile to be low, with pronounced curves. The deck had to be slim to allow for local circulation underneath the bridge. Also, the tight schedule and seasonal flooding dictated that the piers be located outside the river, which impacted the bridge’s main span. 3D Model Analysis Used from Design to Construction While Armando Rito has used RM Bridge since 2003, this was its first opportunity to use the software for the analysis of a cable-stayed bridge. The bridge’s complex geometry made the construction stage analysis and determination of optimized tensioning cable stay forces quite challenging. With help of the RM Bridge Professional Services team, the project engineers were able to accelerate the process and meet the required timeline. Armando Rito also used RM Bridge to model the 3D cablestayed bridge and analyze the geometric attributes and design challenges within the model. This allowed the team to make more informed decisions throughout the construction process, saving time and money. “This was an investment that not only provided important knowledge of the software usage, but also permitted an interesting exchange of ideas and concepts between developers and end-users,” said Pedro Cabral, head of the bridge department at Armando Rito Engenharia SA. “It also improved the experience and know-how about the behavior of this kind of structure.” The team used RM Bridge to compute the complete construction sequence, solving structural problems in the 3D

Open the catalog to page 1
Armando Rito Engenharia Improves Quality of Life in Angola - 2

Symbolic Aesthetics – a Bridge Between Two Nations, Celebrating Freedom “The team is proud to have been able to Construction of the 4th of April Bridge began in July 2007 and was completed in July 2009. The new bridge dramatically shortened the time to cross the river and vastly improved the quality of life for those living in the region. The aesthetic of the structure signifies the freedom of Angola’s people, the end of the war, and the pride taken in modern reconstruction. It is also a symbol of the legacy left by the Portuguese to Angola. Besides being a bridge between the two banks of...

Open the catalog to page 2

All Bentley Systems Europe B.V. catalogs and technical brochures

  1. ConstructSim

    2 Pages

  2. promis•e

    2 Pages

  3. STAAD.Pro

    2 Pages

Archived catalogs

  1. Bentley MAP

    2 Pages