…There from the very start

1960 In 1962 the first independent VDE standard specifically relating to medical locations was published. The A-ISOMETER® 107TM2 was one of the world’s first electronic insulation monitoring devices to ever be launched for use in medical locations.
2.0 A-ISOMETER® 107TM2 (1977) Changeover and monitoring module UM (1994) 1980 2000 In the light of new discoveries and to take account of internationally binding specifications, in June 1981, standard DIN VDE 0107: 1981-06 entitled “Erection and testing electrical installations in medical locations” came into force.At this point, the A-ISOMETER® 107TM40 was introduced for the pur-pose of monitoring IT systems. In addition, series production of alarm indicator and operator panels for hospitals began, specifically those intended for use in operating theatres and on intensive care units. The proliferation of modern bus systems and the desire for more information culminated in the development of the MEDICS® system at the end of the 1990s. The buzzwords associated with this deve- lopment were: increased reliability for power supplies manufacturer in medical locations, data exchange via bus systems, display of information in plain-text format and user-friendliness. In November 2002 standard DIN VDE 0100-710 (VDE 0100-710): 2002-11 came into force, su- perseding DIN VDE 0107 (VDE 0107): 1994-10.This national standard, which is based on international draft standard IEC 60364-7-710, takes account of the latest advances within the field of medical engineering and higher levels of safety awareness. The MEDICS® system also meets these new requirements, thereby providing clear proof of BENDER’s forward-thinking strategy.
A-ISOMETER® 107TM40 with Tableau (1982) 1990 Work continued on German standard DIN VDE 0107 to ensure that it remained in line with the current state of the art. A new edition was published in 1994. The key points covered by this standard were the requirements and use of standalone changeover equip- ment for redundant power supplies. The UM107ETU changeover and monitoring module was the first complete solution for Group 2 rooms to be made available on the market. In addition, the first alarm indicator and operator panels with plain-text display were launched.
Modern changeover and monitoring module UFC107E 6 Main catalogue part 2 – 05.2008/Hospital engineering
DirectIndustry's Virtual Technical Library: PDF Catalogue | Technical Documentation | Brochure | Manual | Industrial directory | Specifications | Characteristics
Search Go
page 1 p.1
page 2 p.2
page 3 p.3
page 4 p.4
page 5 p.5
page 6 p.6
page 7 p.7
page 8 p.8
page 9 p.9
page 10 p.10
page 11 p.11
page 12 p.12
page 13 p.13
page 14 p.14
page 15 p.15
page 16 p.16
page 17 p.17
page 18 p.18
page 19 p.19
page 20 p.20
page 21 p.21
page 22 p.22
page 23 p.23
page 24 p.24
page 25 p.25
page 26 p.26
page 27 p.27
page 28 p.28
page 29 p.29
page 30 p.30
page 31 p.31
page 32 p.32
page 33 p.33
page 34 p.34
page 35 p.35
page 36 p.36
page 37 p.37
page 38 p.38
page 39 p.39
page 40 p.40
page 41 p.41
page 42 p.42
page 43 p.43
page 44 p.44
page 45 p.45
page 46 p.46
page 47 p.47
page 48 p.48
page 49 p.49
page 50 p.50
Pages:
1-50
51-100
101-150
151-196
pdf-page pdf di En 2009-01-02-10