| | | as well as commissioning of the electromechanical equipment: • Four Bulb turbines including electronic-hydraulic speed governors of the digital type • Four three-phase Bulb generators including excitation system • 10.5 kV generator switchgear • Main transformers • Unit protection system • Power plant supervisory control system • SF6 circuit breakers and 110 kV cables • Cabling The project was completed in November 1999. | |
| | The Da Yuan Du hydropower station, located on the Jiuliandeng, main stream of the Xiangjiang River, Hunan Province, China, is part of the second-stage of the Xiangjiang Navigation Multi-purpose Project. | |
| | | |
| | In 1996 VA TECH HYDRO was awarded a contract to supply four Bulbturbine/ Generator units with a total installed capacity of 120 MW and annual energy of 556.5 GWh. The scope of supply included engineering, manufacturing and installation supervision | | |
| | | |
| | | |
| | | |
| | | | |