You may also be interested in
Hoist trolley, Wall mounted jib crane, Double girder crane, Electric chain hoist, Overhead traveling crane
Text version of the page
27 Moving on up.
crane systems
Before the next processing stage,
web plates are welded into place to
protect the girder against twisting;
stiffeners are inserted to improve
the overall stability of the structure.
Following assembly on the box
girder line, the box girder is ready
for processing by the portal welding
unit.
Plates of the lengths required for
box girders are welded together on
a PLC-controlled welding machine.
The butt welding machine can process
plates of different thicknesses
and the automatic weld sequence
control system ensures the highest
welding quality possible.
The moving portal welding unit
designed in-house by ABUS
personnel welds the web plates to
the upper and bottom flanges and
the rails on the top of the girder.
The welding unit can complete
up to six welds at the same time.
The high-performance burners are
automatically controlled by a
PLC. Following the welding of the
closure plates and the installation
of the end carriages, the paintwork
required for the specific application
is applied.
|
|